June 22: Trusses finished.


June 22: Roof trusses put up.


June 7-21: General framing photos. Walls are 2x6 on exterior and one interior wall that is supporting the second story. Other interior walls are 2x4.






June 19: Second floor walls started.




June 12: First wall up!
June 7: Framing started.
June 6: Block work done. Septic system installed.
June 4: Foundation staked.

June 4-5: Electric poles installed.

June 1: Concrete poured.
May 30: Foundation dug.
May 17: Water hooked up.