Friday, August 31, 2007


Well, we finally have a little bit of progress on the house. There has been a major delay getting our exterior doors, which also delayed starting on the siding. So, there's been very little change in the house for over a month.

It is starting to pick up now, though, and we had several materials delivered today. One major thing that was completed this week is the first part of the blown insulation. Here's a picture.

Tuesday, August 14, 2007

An old bathtub I am planning to fix up and use in the house. I got it on ebay.



Here's a picture of the heat and air unit, which is in the attic. It has a frame around it for a little closet. Also a picture of the attic room with window:












Here's a close-up of the upstairs porch and a view onto it from inside. It will be closed in around the bottom and have a railing.


Here are a couple of close-up pictures of the windows. One is an upstairs bedroom window from inside. One is the dining room window from outside. They will be stained on the inside.







August 14: Finally updating the blog.

The roof is finished.

Windows are all in.

The little porch upstairs is framed.

There's Tyvek on the outside of the house.

Here are some general exterior pictures, from the front and from both sides. In the last picture, there will be a chimney in the blank two-story area.